The beautiful 'curved' design of the Arc, in combination with the stainless steel material, gives the bicycle stands a transparent, elegant appearance. When there are no bicycles parked, the Sheffield stand doesn't form a barrier in the public space. The Arc is also ideal for use as a demarcation, and the high quality stainless steel means that these durable bicycle stands are also suitable for use in coastal areas.
The Arc Sheffield stands are now available with new, significantly lighter concrete bases. These new concrete bases reduce CO2 emissions by 66.5% during production and by 50% during transport, are easier to install, and simple to replace.
ADVANTAGES
- elegant, transparent appearance
- functional design
- equipped with new, significantly lighter concrete bases (= low CO2 emissions)
- durable and timeless

Arc Sheffield stand stainless steel with crossbar
Arc Sheffield stand stainless steel with crossbar
Arc Sheffield stand stainless steel with crossbar
MODELS
- Arc 600, with crossbar
- Arc 1200, with crossbar
NEW CONCRETE BASES
The new concrete bases available for the Arc Sheffield stand offer many benefits:
- Much lighter: 19 kg per base
- Less concrete = 66.5% less CO2
- Much lower CO2 emissions: 1.5 kg CO2 per base
- Approximately 50% less CO2 during transport
- All parts can be replaced separately
- Easy placement; less digging required, can be placed under machinery
These new concrete bases not only offer practical advantages but also make the Arc a conscious choice for a more sustainable outdoor environment.
MATERIALS AND TREATMENTS
- 316 stainless steel, stained, passivated and electropolished.
- other finishes, such as polishing, buffing and glass beading are possible.
ARC SPACING
Where the Arc is used as a bicycle stand, we recommend the following spacing:
- when the bicycle is to be placed on one side of the Arc, a minimum of 650 mm
- when the bicycle is to be placed on both sides of the Arc, a minimum of 900 mm
The concrete base for the Arc is embedded below ground level. The Arc model without a concrete base needs to be set in poured concrete on site.